Vantage Logistics transported a shipment of oversized overweight equipment (Break Bulk) for the PALU-3 Coal-fired Steam Power Plant project

19/06/2023

Project Information

Shipment 1st data:
Project: PALU-3 COAL-FIRED STEAM POWER PLANT (2X50 MW)
  • Commodity: Tubular Air Preheater
  • Volume: 433 PKGS
  • Gross Weight: 2,077,387 KGS/ 9,219 CBM
  • POL: Doosan port, Dung Quat, Viet Nam
  • POD: Palu sea port, Indonesia
  • Shipping Time: 15th-27th Jul, 2022

Vantage Logistics transported a shipment of oversized overweight equipment (Break Bulk) for the PALU-3 Coal-fired Steam Power Plant project
[Vantage Logistics] Surveyed and planned the sea transportation of oversized equipment and accessories (Break Bulk) for the PALU-3 coal-fired steam power plant project

Vantage Logistics’ scope: With the position of “Port Captain” Vantage cooperates with the ship owner to survey and stowage plan arrangement; Lashing, securing & dunnage to suitable each type of cargo.

Vantage Logistics has cooperated with factories, ports, shipping agents, vessels, and port stevedoring offering reasonable loading of cargo onto the vessel according to the schedule of the vessel.