Vantage Logistics Completes Handover of Oversized Equipment for the Quang Trach 1 Thermal Power Plant – A National Key Energy Project under the Quang Trach Power Centre, Quang Tri Province

Vantage Logistics has completed the handover of two Continuous Ship Unloader (CSU) systems and accessories moved from Shanghai, China to Hon La Port, Viet Nam. This oversized shipment plays a crucial role in finalising a key component of the Quang Trach 1 Thermal Power Plant – a national strategic energy project currently under development at the Quang Trach Power Centre. The CSU systems are core elements of the plant. They perform the full coal unloading process from bulk carriers and ensure a stable fuel supply to both generating units. Their timely installation is essential for the plant to meet its commissioning schedule. Supporting a National Energy Project: Ensuring Progress and Supply Security Project: Quang Trach 1 Thermal Power Plant, part of the Quang Trach Power Centre Investor: Vietnam Electricity (EVN) Project Manager: Power Project Management Board No. 2 (PMB2) Location: Quang Trach Power Centre, Quang Dong Commune, Quang Trach District, Quang Tri Province Under the guidance of the Government and EVN, the key target for the project is to synchronise Unit 1 to the national grid in December 2025, strengthening national energy security and supporting stable electricity supply for the central and southern regions. The completion of the CSU handover in September 2025 ensures that the project’s equipment supply timeline is maintained, supporting PMB2 in executing several critical work packages. This reinforces Vantage Logistics’ position as a trusted logistics partner for large-scale energy developments. Energy Development Landscape in North Central Viet Nam The progress of the Quang Trach 1 project takes place as the North Central region undergoes significant structural changes: Administrative merger: From 1 July 2025, Quang Binh and Quang Tri officially merged to form the new Quang Tri Province, covering approximately 12,700 km² with a population of around 1.87 million. The region now possesses an expanded development corridor, including a 240-km coastline and a network of strategic multimodal logistics infrastructure (Hon La Port, My Thuy Port, Dong Hoi Airport, and Quang Tri Airport). Large-scale shift towards cleaner energy at the Quang Trach Power Centre: The centre is not only home to Quang Trach 1 but also to several major projects driving the region’s energy transition: Quang Trach II LNG Power Plant: Capacity 1,500 MW (2 × 750 MW), investment capital approx. VND 52,490 billion. The project is finalising its feasibility study and EPC contractor selection, with groundbreaking expected in Q4/2025 (December). Quang Trach III LNG Power Plant: Included in Power Development Plan VIII, located in Phu Trach Commune with a planned capacity of 1,500 MW. Investor selection (proposed as EVN) is underway for implementation during 2031–2035. Coal Import Terminal & Breakwater: Featuring two berths for vessels up to 100,000 DWT (coal throughput 7.2 million tonnes/year), ensuring stable fuel reception. This is also where the newly handed-over CSU systems will operate. 500 kV Quang Trach – Doc Soi Transmission Line: Successfully energised for technical testing. The double-circuit line spans more than 500 km, connecting the Quang Trach Power Centre to the national grid and ensuring stable transmission capacity. The integrated development of these components not only meets growing electricity demand but also reflects the long-term vision of EVN and the Vietnamese Government under Power Development Plan VIII. It strengthens economic growth prospects and state revenue for the newly formed Quang Tri Province, creating strategic collaboration opportunities for logistics partners such as Vantage Logistics. Vantage Logistics – A Reliable Partner for Energy and Infrastructure Projects Vantage Logistics continues to support energy and infrastructure developments by providing logistics solutions tailored for oversized equipment and technically demanding cargo. With experience gained from projects such as Quang Trach 1, Vantage remains committed to safe, timely, and cost-effective service delivery. Contact Vantage Logistics to explore logistics solutions for energy projects. Explore more actual project images below: Project name: Quang Trach 1 Thermal Power Plant Commodity: Continuous Ship Unloader (CSU) systems and accessories Volume: 2 UNITS / 2,739 TONS / 60,000 CBM Port of Loading (POL): Shanghai, China Port of Discharge (POD): Hon La, Viet Nam Time of Shipment: 09/2025

25/11/2025

View More

Energy

Vantage Logistics’ OOG Expertise: Delivering Complex Hydropower Components from Viet Namto Shin Sakagami Plant (Japan)

Vantage Logistics continues to affirm its capability in handling complex project cargo with the successful delivery of key hydropower components – including the steel structures of the Draft Tube, Spiral Case, and Discharge Ring – from Hai Phong, Viet Nam to Toyama, Japan, as part of the Shin Sakagami Hydropower Plant Project. Behind the success of this international shipment lies precise technical execution and comprehensive coordination. Coordination Power – The Key to Complex OOG Cargo Transporting oversized cargo like hydropower components demands near-perfect precision. Behind this cross-border journey was the seamless collaboration and high-level responsibility of the entire Vantage Logistics team: Cost & Technical Optimization: Proposed the most efficient and cost-effective transport plan, balancing financial performance with operational safety. Tight Schedule Management: Proactively coordinated vehicles, arranged trucking, secured cargo with technical precision, and completed export procedures within a narrow time frame. Integrated Communication: Maintained smooth coordination among all stakeholders to ensure on-time delivery as planned. “Every project is a test of coordination and accountability. Behind every success is the effort of an entire team – not only those directly involved in operations, but also those preparing, coordinating, and supporting behind the scenes,” shared a Vantage Logistics representative. People – The Foundation of Every Successful Project At Vantage Logistics, we believe that technology and processes are tools – but it’s the human factor, with flexibility, dedication and responsibility, that truly brings each project to completion. From our customer-focused sales team and experienced operations staff to our on-site personnel and professional documentation department, every member works in close coordination to ensure that every technical detail, document and delivery timeline meets the highest standards. The Shin Sakagami project once again demonstrates Vantage Logistics’ capability in handling complex OOG cargo and reinforces our commitment to accompanying clients on every journey – from Viet Nam to the world. Comprehensive Project Logistics Solutions – For Every Complex Transport Need With over two decades of experience in project cargo execution across Viet Nam and internationally, we offer tailor-made logistics solutions for each project: OOG & special project transport via road, sea, and multimodal Full-package customs and documentation services for fast clearance International transport solutions connecting Viet Nam with regional industrial hubs Technical logistics consulting to optimize routes and costs Vantage Logistics is committed to delivering safe and efficient solutions, partnering with businesses to realize large-scale international projects. Contact us today for the most optimized logistics solution for your OOG cargo! See below for real-life images of the project execution process: Project name: Shin Sakagami Hydropower Plant Commodity: Steel Structure of Draft Tube, Spiral Case, Discharge Ring Port of Loading (POL): Hai Phong, Viet Nam Port of Discharge (POD): Toyama, Japan Time of Shipment: 05/2025 Scope of Work: Pre-carriage from the construction site in Hai Duong to Hai Phong Port International transport of OOG and general cargo from Viet Nam to Japan

12/11/2025

View More

Energy

Vantage Logistics: 3,700 Tons of Heavy-Lift Cargo from Quang Ngãi, Viet Nam to Singapore – Delivered Safely and On Schedule

Vantage Logistics has successfully completed the transportation of heavy-lift cargo for the Seraya Power Generation Project – Batch 2, delivering 31 packages of Casing Structural Steel from Quang Ngãi, Viet Nam to Singapore. The operation met stringent technical requirements and was executed on schedule. Due to the oversized dimensions and extreme weight, the cargo required meticulous planning for transport equipment, lifting solutions and risk mitigation at every stage – from jobsite mobilisation to port operations. Vantage Logistics: Behind Every Ton, A Team That Delivers Behind each multi-ton package is a dedicated team working tirelessly to ensure flawless execution. Preparation and execution spanned several days under unpredictable weather and tight deadlines. Vantage Logistics deployed flexible shift teams, maintaining on-site presence from early morning to late night to ensure uninterrupted operations. “We don’t just move cargo – we carry our clients’ trust and commitment to quality. Every package is a responsibility.” – Operations Team Lead Given the heavy-lift nature of the cargo, strict safety protocols were enforced. Technical and field teams conducted continuous monitoring, route risk assessments, and detailed equipment checks to eliminate any margin for error. Beyond Execution: Strategic Partnership in Every Move Vantage Logistics goes beyond transportation. We work closely with clients to provide consultative support and tailored logistics solutions that optimise time and cost. Multiple routing and handling options were proposed to help clients balance cost-efficiency, delivery timelines and safety standards. This flexibility not only enhances operational performance but also reflects our commitment to putting client interests first. Vantage Logistics – Trusted Partner for Energy Projects in Vietnam and the Region We specialise in end-to-end logistics solutions for industrial equipment and heavy-lift cargo, with proven expertise in large-scale energy projects: Transport planning and technical risk assessment Multimodal coordination (road–sea) On-site management and continuous technical supervision Cost optimisation aligned with project milestones Compliance with stringent industrial safety standards Safe execution across energy and industrial infrastructure projects With extensive experience in handling energy and industrial equipment, Vantage Logistics is committed to helping clients minimise risk, control costs and meet project deadlines. Contact us today for tailored logistics solutions for your energy, oil & gas, and industrial construction projects! See more project images below: Project name: Seraya Power Generation Project – Batch 2 Commodity: Casing Structural Steel Volume: 31 PKGS / 3,605.78 TONS / 7,992.94 CBM. Among them, 15 packages ranging from 5 to 262 tons, with lengths exceeding 31 meters: 3 PKGS: 29mL x 4.7mW x 2.88mH x 207 TONS / each 3 PKGS: 31.22mL x 4.85mW x 3.7mH x 262 TONS / each 3 PKGS: 30.01mL x 4.6mW x 3.47mH x 234.5 TONS / each 3 PKGS: 30.18mL x 4.65mW x 3.43mH x 208.5 TONS / each 3 PKGS: 29.58mL x 4.58mW x 2.83mH x 197.5 TONS / each Port of Loading (POL): Quảng Ngãi, Viet Nam Port of Discharge (POD): Singapore Time of Shipment: October 2025 Scope of Work: Inland transport from jobsite to port Port handling up to FAS (Free Alongside Ship) using specialised trailers Continuous coordination to ensure delivery milestones

30/10/2025

View More

Energy

Vantage Logistics Successfully Launches USD 618 Million Seraya Power Generation Project – Batch 1

The first shipment for the Seraya Power Generation Project – one of Singapore’s largest clean energy developments – has been delivered successfully by Vantage Logistics, marking a solid start to a high-precision heavy-lift operation. A total of 87 units of Casing Structural Steel, weighing 1,196.99 TONS / 6,640.54 CBM, were transported over 2,200 km by sea from Hai Phong, Viet Nam to Singapore under strict coordination and engineering supervision by the Vantage Logistics team. Seraya – A Regional Milestone in Clean Energy With a total investment of USD 618 million, a planned 600MW capacity and future-ready clean hydrogen operations, the Seraya Power Generation Project plays a critical role in Singapore’s energy transition strategy – reducing emissions and strengthening national energy security. The heavy-lift configuration and complex routing required detailed technical assessment, strict load control and fit-for-purpose lifting and stowage solutions to maintain smooth operations. Zero-Error as the Vantage Operational Standard Tight schedule, weather uncertainty and site constraints posed significant challenges. To ensure absolute precision at every stage, Vantage Logistics implemented enhanced operational controls: Round-the-clock manpower & supervision (24/7) Technical risk checks at all transfer points Continuous coordination among contractor, port and carrier Beyond process and equipment, it is the people behind the operation who determine success. Our engineers, coordinators and port operation staff worked overnight, ensuring no milestone was missed. Every detail was tracked and verified because we understand that accuracy protects both performance and customer trust. A minor deviation could delay the activation of a key regional energy asset. This is why zero-error is not a target but a daily operational standard at Vantage Logistics. Batch 1 – A Proven Start to a Multi-Phase Heavy-Lift Programme As the opening shipment, the success of Batch 1 demonstrates Vantage Logistics’ ability to standardise and scale operations for upcoming consignments. Our integrated solutions include: Engineering design & validation for heavy-lift units Multimodal coordination – road & sea 24/7 on-site supervision for accuracy at every step Cost-linked scheduling for effective budget control Full adherence to international industrial safety standards With capability proven in Batch 1, Vantage Logistics remains committed to supporting Seraya Power Generation throughout the project – delivering international-standard logistics for one of the region’s most important clean energy initiatives. Vantage Logistics: Tailored & Optimised Solutions for Every Project Each project is unique – and logistics efficiency requires flexibility. For Seraya, Vantage Logistics developed multiple routing and handling scenarios based on: Target safety performance Investment budget per construction phase Real-time project schedule Our tailored approach supports cost control and reduces operational risk across the full project lifecycle – reinforcing long-term customer value. Ready to Support Energy Projects Across the Region Vantage Logistics provides safe, efficient transport solutions for heavy-lift industrial and energy equipment. Contact us today for a logistics plan aligned with your project objectives! See more project images below: Project name: Seraya Power Generation Project – Batch 1 Commodity: Casing Structural Steel Volume: 87 PKGS / 1,196.99 TONS / 6,640.54 CBM Port of Loading (POL): Hai Phong, Viet Nam Port of Discharge (POD): Singapore Time of Shipment: 06/2025 Scope of Work: Inland transport from jobsite to port Handling and storage at port Delivery at FAS (Free Alongside Ship) terms Multi-party coordination across the supply chain...

29/10/2025

View More

Energy

Vantage Logistics Successfully Delivers Wind Energy Converter Spare Parts to ENERCON Warehouse in Long Thanh, Dong Nai

Vantage Logistics Successfully Delivers Wind Energy Converter Spare Parts to ENERCON Warehouse in Long Thanh, Dong Nai On May 20, 2025, Vantage Logistics completed the delivery of spare parts for wind energy converters, from Hamburg Port, Germany to ENERCON’s warehouse in Long Thanh, Dong Nai Province, Vietnam This project marks an important milestone in Vantage Logistics’ transportation and coordination capabilities, reaffirming the company’s commitment to providing professional, efficient and secure logistics solutions for the renewable energy sector in Vietnam. Optimised Transportation – Ensuring Safe and On-Time Delivery Throughout the process, Vantage Logistics conducted a thorough assessment of the cargo, transport routes and delivery site to design a cost- and time-efficient logistics plan. The operations team worked closely with ENERCON to coordinate a flexible delivery schedule, ensuring safe and seamless handling at the Long Thanh warehouse. Streamlined Logistics Solutions – Supporting Green Energy Needs As a trusted partner in machinery and industrial equipment transportation, Vantage Logistics is proud to contribute to renewable energy development projects. Leveraging strict operational procedures, in-depth customs advisory and multimodal handling (sea and road), Vantage delivers effective, economical, and safe logistics solutions for large-scale projects. Professional Service by Vantage Logistics Tailored transport and customs advisory for each project phase Detailed surveys of delivery routes and hard-to-access locations Continuous coordination to ensure on-time delivery Full cargo protection with strict compliance to safety standards With extensive experience managing industrial equipment and renewable energy projects, Vantage Logistics stands ready to support customers in overcoming complex logistics challenges, driving sustainable growth in Vietnam’s energy sector. Vantage Logistics delivers tailored transport solutions for industrial and renewable energy ventures – contact us today! Commodity: Wind energy converter spare parts, totaling EUR 415.098,39 Delivery date: 20 May, 2025 Port of Loading (POL): Hamburg, Germany Port of Discharge (POD): Cat Lai, Vietnam Final delivery location: ENERCON Warehouse, Long Thanh, Dong Nai Scope of work: From CFR at Cat Lai Port to DAP at customer’s warehouse, including on-site cargo handling...

18/08/2025

View More

Energy

BLOCK B – O MON GAS PROJECT, VANTAGE LOGISTICS – A SPECIALIZED PROJECT LOGISTICS PARTNER

BLOCK B – O MON GAS PROJECT, VANTAGE LOGISTICS – A SPECIALIZED PROJECT LOGISTICS PARTNER Block B – O Mon Gas Project is one of Vietnam’s key national energy developments, with a total investment of nearly USD 12 billion. It plays a crucial role in the country’s energy security strategy over the next decade. Given its interdisciplinary nature, multi-site deployment, and simultaneous execution across components, the project requires a highly specialized logistics system – from bulk cargo and heavy-lift transport to project customs clearance. Since late 2024, Vantage Logistics has been honored to serve as the logistics partner for various project packages within the Block B value chain in the role of customs broker and transport provider for imported goods and high-specification technical equipment. Key EPC packages EPCI-1: Engineering, Procurement, Construction, and Installation of the Central Processing Platform (CPP) and offshore pipeline system. Total contract value: ~USD 1.1 billion. EPCI 2–4, CPP, LQP, infield & onshore pipelines: Including satellite platforms, infield pipelines, and onshore pipeline sections. These packages are being implemented in phases, targeting construction completion by the end of 2025 and commercial gas flow by late 2026. O Mon power infrastructure​:   – O Mon I: Already in operation, with expansion plans –  O Mon II–IV: Scheduled for commercial operation (COD) in 2026, 2027, and 2028 respectively – all powered by gas from Block B. Overview of Block B project, offshore Vietnam – Photo source: Petrotimes Magazine Block B value chain is expected to deliver 5.06 billion m³ of gas annually, supplying the O Mon power complex with up to 3,800 MW in total capacity – a critical factor in Vietnam’s energy security strategy. Block B – O Mon gas project plays a decisive role in securing energy supply for the Mekong Delta, reducing dependence on coal and imported energy sources.   2.    Vantage Logistics – Project logistics solution provider   With in-depth expertise in handling oversized cargo, heavy-lift equipment, high-tech machinery, and customs procedures for energy projects, Vantage Logistics has been trusted and chosen by numerous units to serve as the logistics partner for key packages within the Block B – O Mon gas project.   Since November 2024, Vantage has officially taken on the following specialized logistics scopes: Consulting and handling customs clearance for all imported project cargo; Processing investment incentive documentation: C/O Form D, tax exemptions, and waiver procedures; Domestic transportation of bulk cargo and fabricated structures for offshore pipeline and foundation construction. Vantage’s dedicated project team has continuously executed logistics procedures and transport plans to meet the project’s strict timelines, aligned with international standards and the technical requirements of the oil & gas industry. Currently, the next logistics packages are being initiated, including transportation for onshore construction, gas station foundations, and the gas-fired power plants at the O Mon Power Center. This phase demands complex logistics planning, tight time control, procedural precision, and strict safety standards. Vantage Logistics continues to accompany project investors and EPC contractors through the upcoming phases of the Block B – O Mon project, offering a full suite of project logistics services, including: Professional customs brokerage, ensuring fast, compliant, and risk-free import procedures; Comprehensive logistics partner – supporting the supply chain from port to site, import to final distribution; A reliable bridge – helping contractors and subcontractors navigate the challenges of high-volume, complex packages and demanding timelines Project location: Covering gas fields in Block B, 48/95, and 52/97 – located offshore in southwest Vietnam. Project structure across the gas value chain: Upstream: Development of the Block B offshore gas field. Midstream: A ~430 km pipeline transporting gas from the offshore field to onshore facilities at O Mon. Downstream: A cluster of four gas-fired power plants – O Mon I to IV – located in Can Tho City, with a total installed capacity of approximately 3,810 MW....

23/06/2025

View More

Energy

Vantage Logistics Successfully Delivers 2 Shipments of Wind Turbine Towers from Viet Nam To Germany

Vantage Logistics Successfully Delivers 2 Shipments of Wind Turbine Towers from Viet Nam To Germany . Vantage Logistics successfully completed two important shipments within the framework of the “Towers for Wind Farm” project, with goods being wind power tower sections exported from Vietnam to Germany. Shipment 2: 28 packages / 8,653 FRT Vantage Logistics played a pivotal role not only in transport execution but also in overall project coordination. For months, our team worked closely with the client during the manufacturing process to align shipment schedules with production timelines. End-to-End Coordination: From factory floor to vessel deck, our team managed continuous cargo flow with no interruption, even during local holidays. Operational Readiness: Manpower and equipment were pre-arranged to ensure immediate cargo handling, meeting the customer’s tight delivery timeline. Cost Optimization: Direct loading from truck to vessel minimized storage and port handling time, offering a cost-effective and efficient logistics solution. Project name: Towers for Wind Farm Cargo: Wind Turbine Towers Volume: ~40,000 FRT Scope by Vantage: Project coordination Storage & inland transportation Port handling & shipment arrangement POL: Phu My Port, Vietnam POD: Rostock Port, Germany Shipment Timeline: From August 2024 to present...

23/05/2025

View More

Energy

Vantage Logistics successfully transported of Wind Turbine Shell to Bac Lieu Construction Site via Huu Nghi Border Gate

Vantage Logistics successfully transported of Wind Turbine Shell to Bac Lieu Construction Site via Huu Nghi Border Gate On October 26, 2024, Vantage Logistics successfully completed the transportation of a wind turbine shell from Huu Nghi Border Gate to the construction site in Bac Lieu, demonstrating its expertise in managing oversized and heavy cargo transport projects. VLC has surveyed the cargo as well as routes to ensure safety and optimize costs. The cargo are securely fastened for long-distance transportation to minimize any risk of scratches, and the procedures are carried out quickly to ensure on-time delivery, avoid incurring additional fees for truck waiting at the border gate Advantages of Transporting via Huu Nghi Border Gate Strategic Location: Huu Nghi Border Gate serves as a key connection point between Vietnam and China, located close to major routes that help shorten transit times between the two countries. Quick Customs Clearance: The customs clearance process at Huu Nghi Border Gate is simple and fast, minimizing waiting times and facilitating smooth cargo movement. Diverse Cargo Handling: Huu Nghi Border Gate can accommodate a wide range of cargo types, from consumer goods to industrial materials, creating a rich trade environment. Developed Infrastructure: With upgraded roads and storage facilities, the border gate is well-equipped to handle oversized and heavy cargo effectively. Cost-Effective: Compared to other routes, transportation costs through Huu Nghi Border Gate are more economical, offering cost savings for import and export businesses. With the success of this project, Vantage Logistics reaffirms its role as a trusted partner in transportation and logistics, committed to delivering optimized shipping solutions and the highest quality service for clients. Completion Date: October 26, 2024 Pickup Location: Huu Nghi Border Gate Transportation Location: Bac Lieu Construction Site Cargo: Wind turbine shell...

11/11/2024

View More