Successfully Transported Draft Tube ASM FSP for Upper Taft Project

22/08/2023

Project Information

  • Project name: UPPER TAFT
  • Commodity: Draft Tube ASM FSP/ Draft Tube ASM FSP
  • Cargo volume: 4×40 HC + 1×20 OT + 1×40 OT + 7×40 FR
  • Port of loading (POL): Hai Phong port, Việt Nam
  • Port of Discharge (POD): Cebu port, Philipines
  • Shipment time: 3/2023 – 4/2023

Successfully Transported Draft Tube ASM FSP for Upper Taft Project  

Scope of work:
  • Packaging/ lashing and transported cargo from the seller’s factory in Bac Ninh to Hai Phong Port, Viet Nam
  • Sea freight from Hai Phong Port, Viet Nam to Cebu Port, Philippines

Vantage Logistics has conducted a cargo survey and appropriate suitable packaging/ lashing plan before transporting and ensured safe and on schedule as required, with the most optimal cost

Solution Project Logistics

Contact us now for a free consultation!

Start your project today with our expert team – fast, professional, and tailored just for you. Contact us now to get started!

Contact Us