PROJECT NEWS

Petrochemical

Project Logistics Execution for the Block B – O Mon Gas Pipeline

Amid the peak deployment phase of gas and energy infrastructure projects across Viet Nam, the Block B – O Mon Gas Pipeline Project stands out as a key national development with strategic importance for energy security. Vantage Logistics continues to support the project by executing the inland transportation scope, delivering cargo from Ho Chi Minh City Port to the project site. This leg is critical to the overall schedule and requires secure cargo reinforcement, close operational coordination, and tight timeline control to meet the investor’s technical and safety requirements. By closely monitoring vessel schedules and container status upon arrival, and proactively arranging vehicles for immediate cargo pick-up, the delivery process was completed as planned. This approach helped avoid container demurrage and storage charges while keeping total transport costs within the approved budget. Pipeline Equipment Transport: Precision for Pipe Bend & Pup Pieces Transporting pipeline equipment for gas and energy projects goes far beyond moving cargo from port to site. With heavy, long, oversized cargo and strict safety requirements, each shipment demands a dedicated technical plan, disciplined schedule control, and seamless coordination across multiple stakeholders. Key operational factors include: Vehicle selection aligned with cargo weight and dimensions Accurate lashing and securing procedures to minimise movement risks Route and movement planning compatible with infrastructure conditions and traffic windows Close coordination between port operators, transport providers, and the construction site Even minor misalignment in preparation can result in delays or significant cost overruns for the project. Continued involvement in the Block B – O Mon Project allows Vantage Logistics to effectively leverage route data, vehicle configurations, and coordination workflows standardised since November 2024. This enables more realistic transport planning, shorter handling times, and reduced operational adjustments. Logistics as a Critical Element of Energy Project Delivery On-the-ground execution demonstrates that logistics plays a decisive role in maintaining project timelines and operational stability. Controlled handling of each transport detail contributes directly to the steady progress of a nationally significant energy project. Contact Vantage Logistics to discuss tailored transport solutions for project cargo and oversized shipments requiring specialised logistics execution. Commodity: Pipe Bend & Pup Pieces Volume: 5 x 40’ HQ + 2 x 40’ FR (Out of Gauge) Port of Loading (POL): Busan, South Korea Port of Discharge (POD): Ho Chi Minh City, Viet Nam Execution Period: 12/2025 Scope of Work: Inland transportation from Ho Chi Minh City Port to the project site

31/12/2025

View More

Industrial

Vantage Logistics Completes Delivery of USD 81,599 Textile Yarn Shipment for Manufacturing Project in Long An

Vantage Logistics has successfully completed the transportation of a textile yarn shipment for a manufacturing plant project in Long An, moving cargo from Qingdao Port, China to Viet Nam and delivering it to the project site in line with the project’s required schedule. Throughout the operation, the Vantage Logistics team closely monitored the shipment schedule and proactively adjusted handling plans to help minimise potential cost exposure for the customer. Schedule Pressure from the Project Site The construction timeline allowed little room for delay. Any disruption during customs clearance or inland transportation could have affected downstream work packages and led to additional costs. With this in mind, as soon as the cargo arrived at Ho Chi Minh City port, Vantage Logistics deployed two workstreams in parallel: completing customs documentation while preparing inland transport resources. Leveraging hands-on experience in customs clearance and a dedicated road transport network, the shipment was cleared promptly and released from the port without unnecessary dwell time. End-to-End Coordination from Port to Site During inland delivery, Vantage Logistics acted as the central coordinator between port operators, transport partners and the receiving team at the Long An project site. Delivery schedules were adjusted flexibly based on actual port conditions and site readiness, enabling the client to plan manpower and site operations more effectively while reducing the risk of additional handling costs. Throughout the process, dispatch teams maintained a continuous flow of information, long-haul drivers focused on on-time delivery, and project specialists stayed in close contact with the client to ensure full visibility of shipment progress. With an operational network across Asia and internationally recognised certifications such as C-TPAT, IATA and ISO 9001:2015, together with a licensed customs brokerage, Vantage Logistics supports complex logistics requirements for large-scale industrial projects through integrated and practical solutions. Contact Vantage Logistics to discuss a logistics solution aligned with your project schedule and operational requirements. Project name: Textile yarn shipment for a manufacturing plant in Long An Commodity: Textile yarn, total value USD 81,599 Port of Loading (POL): Qingdao, China Port of Discharge (POD): Ho Chi Minh City, Viet Nam Time of Shipment: 12/2025 Scope of Work: International ocean freight Customs clearance services Inland transportation from Ho Chi Minh City port to the project site in Long An Delivery coordination in line with construction progress

29/12/2025

View More

Industrial

Vantage Logistics Continues Successful Execution of HRSG Lifting Frame Shipment for Calik Kiyanly Project from Viet Nam to China

Vantage Logistics has successfully completed the transportation of HRSG lifting frames and erection structures with a total value exceeding USD 650,000. Following the successful first shipment in August 2025, the client once again entrusted Vantage Logistics with the second shipment for the Calik Kiyanly project, demonstrating absolute confidence in the team’s capability and reputation. Project Logistics Team: Ensuring HRSG Shipment Progress For the HRSG lifting frame and erection structures – high-value equipment requiring stability in handling – Vantage Logistics focused on three key factors: cost, schedule, and multi-party coordination. From the planning stage, the project team evaluated feasible routes and proposed cost levels aligned with market conditions in September 2025, enabling the client to proactively manage budgets and minimize risks of unexpected surcharges. During execution, the Vantage team closely monitored each milestone – from FCA handover at Hai Phong Port, FAS arrangements, to vessel loading schedules. This synchronized control ensured the shipment departed on time, supporting the client in meeting project installation deadlines. Additionally, Vantage Logistics successfully connected and coordinated seamlessly among stakeholders. Factories, carriers, and ports had different technical requirements, but the Vantage team maintained continuous communication to resolve issues quickly – from vehicle allocation and equipment setup to documentation. This approach reduced waiting times and minimized port-related incidents. Thanks to the proactive involvement of the Project Logistics team at every stage, the shipment was handled smoothly, maintaining schedule and reducing potential costs from storage or rescheduling. This is the value clients receive when the team plays a central role in every operational decision. Comprehensive Project Transportation Solutions With over 23 years of experience in project cargo and heavy-lift transportation, Vantage Logistics continues to affirm its capability to deliver end-to-end solutions: Transportation of OOG & project cargo by road, sea, and multimodal methods Documentation and customs services for large and urgent shipments Technical consulting and cost/time optimization planning International transportation solutions connecting Vietnam with the global network Vantage Logistics is committed to providing safe, efficient, and tailored services for every complex transportation need. See more project images below:   Commodity: HRSG lifting frames and erection structures Port of Loading (POL): Hai Phong, Viet Nam Port of Discharge (POD): Tianjin, China Time of Shipment: 09/2025 Scope of Work: FCA Haiphong port to FAS International Freight shipping from Viet Nam to Tianjin

03/12/2025

View More

Industrial

Transportation of equipment shipment for Dongguan Woo Sung Chip Scale Mould Ltd

Transportation of equipment shipment for Dongguan Woo Sung Chip Scale Mould Ltd VVantage Logistics successfully transported project equipment for Dongguan Woo Sung Chip Scale Mould Ltd, demonstrating the professionalism of the Project team in handling complex logistics requirements. The Vantage team closely monitored the shipment, providing timely advice and solutions to address challenges related to scheduling and documentation. We handled the paperwork and other procedures to ensure the equipment was delivered to the port smoothly. Cost optimization: Vantage provided the most optimal and cost-effective solution, meeting customer satisfaction. Vantage Logistics met the strict requirements of the customer and successfully coordinated and connected the relevant parties to arrange cargo pick-up and delivery smoothly, ensuring the shipment was transported safely and on time. Project name: Equipment for Dongguan Woo Sung Chip Scale Mould Ltd Commodity: Vertical machining center – Used machine Volume: ~26 TEUS Max dimension: 1 Package: 9m (L) x 3.95m (W) x 2.7m (H) / 34,500 Kg 1 Package: 10m (L) x 2.7m (W) x 3.8m (H) / 17,300 Kg Port of Loading (POL): LAEM CHABANG PORT, THAILAND Port of Discharge (POD): SHEKOU PORT, CHINA Vantage Logistics Scope of Work: From the door in Patumthani Province, Thailand, to Shekou Port, China Time of shipment (TOS): 06/2024...

13/08/2024

View More

Industrial

Vantage Logistics successfully transported oversized and overloaded HRSG Erection and Lifting Frames (Break Bulk) from Viet Nam to South Korea

Vantage Logistics successfully transported oversized and overloaded HRSG Erection and Lifting Frames (Break Bulk) from Viet Nam to South Korea Vantage Logistics Scope of Work: Lashing cargo Handling and transporting from the PTSC Quang Ngai Factory in Dung Quat, Quang Ngai to the SSIT Vung Tau Port, Viet Nam Sea Freight from SSIT Vung Tau Port, Viet Nam to Busan, South Korea Transportation from Busan Port to Masan Port, South Korea Shipment Time: 08/05/2024 – 28/05/2024 Vantage Logistics has offered multiple transportation solutions for the project, assisting customers in choosing the most optimal option for specific requirements while ensuring time and cost efficiency. Furthermore, Vantage has provided a practical solution for customers to ensure payment documentation with relevant parties, maintain cargo safety, and meet delivery schedules at the designated location. Vantage has implemented a strategy of using container ships for Breakbulk cargo, optimizing the transportation process. This approach not only minimizes risks but also enhances flexibility in managing and transporting special cargo. SSIT Vung Tau Port, Viet Nam This successful transport demonstrates the professionalism and dynamism of the Project team, overcoming all challenges in transporting oversized and overloaded cargo and international freight. Vantage is committed to providing the most optimal solution for every project. Project name: ATBACH & HEILBRONN CUMBERLAND Commodity: HRSG Erection Frames & HRSG Lifting Frames Volume: 7 BBK Items + 03x40HC/ 222.733 TONS / 597.36 CBM – Main Beam – Lifting Frame LF-10-1 (26.17mL x 1mW x 2.17mH) – Main Beam – Lifting Frame LF-10-1 (26.17mL x 1mW x 2.17mH) – Main Beam – Lifting Frame (26.17mL x 1mW x 2.17mH) – Erection Frame (30.98mL x 1.2mW x 2.52mH) – Erection Frame (30.98mL x 1.2mW x 2.52mH) – Erection Frame (30.98mL x 1.2mW x 2.50mH) – Erection Frame (30.98mL x 1.2mW x 2.50mH) Port of Loading (POL): SSIT Port, Vung Tau,  Viet Nam Port of Discharge (POD): Busan Port, South Korea Delivery Address: Masan Port, South Korea...

11/06/2024

View More
1 5 6 7 8 9 33

Solution Project Logistics

Contact us now for a free consultation!

Start your project today with our expert team – fast, professional, and tailored just for you. Contact us now to get started!

Contact Us