Safely transported A shipment of Equipment for Project in Murchison, Australia

13/02/2020

Project Information

Safely transported A shipment of Equipment for Project in Murchison, Australia

– Project: Deflector Gold Project

– Commodity: 12m Thickener

– Volume: 6 packages, total volume of 38.1 tons, were loaded into 2*40’OT IG and 2*40’FR OWOH, of which the biggest unit is 11.2mL x 4.658mW x 2.973mH x 9tons

– POL: Hai Phong port, Vietnam

– POD: Fremantle Port, Australia

– Vantage’s scope: Trucking from Lilama 69.3 factory to FOB Haiphong port, Customs clearance, port operation.

– Shipment time: 08 – 12Jan 2020