Transported the 2nd shipment of oversized accessories packages (BreakBulk) for the PALU-3 Coal-Fired Steam Power

03/07/2023

Project Information

  • Project: PALU-3 COAL-FIRED STEAM POWER PLANT (2X50 MW)
  • Commodity: Tubular Air Preheater
  • Volume: 165 PKGS
  • Gross Weight: 756,464 KGS/ 2,344 CBM
  • POL: Doosan port, Dung Quat, Viet Nam
  • POD: Palu seaport, Indonesia
  • Shipping Time: 15th Nov- 03rd Dec, 2022

Transported the 2nd shipment of oversized accessories packages (BreakBulk) for the PALU-3 Coal-Fired Steam Power
Project information:
Shipment 2nd data: