Vantage successfully delivered the last shipment for Bangabandhu Sheikh Mujib Railway Bridge Construction Project by break bulk

26/05/2022

Project Information

  • Commodity: Steel pipe sheet pile + accessories
  • Volume: 270 steel pipes and 15 packages of accessories, in which the longest pipe is up to 26.7m
  • Gross Weight: 4,200.947 Tons/ 22,800 CBM/ vessel capacity of 18,458 dwt (fully loaded)
  • Max length: 26.7 (m)
  • Vantage’s scope: stowage plan, stability calculation, port operation supervisor, sea transportation.
  • Shipment time: 17th Apr, 2022

Vantage successfully delivered the last shipment for Bangabandhu Sheikh Mujib Railway Bridge Construction Project by break bulk

This is the 15th and also the last shipment of this project.

With this shipment, Vantage add another record into our capacity and experience in chartering break bulk cargo; providing customers with the best services; diversified, quality, and specialized solutions.

Solution Project Logistics

Contact us now for a free consultation!

Start your project today with our expert team – fast, professional, and tailored just for you. Contact us now to get started!

Contact Us