Vantage Successfully Transported Shipment For Nghi Son Steel Rolling Mill No. 2 Project By Break Bulk

28/02/2022

Project Information

– Project: Nghi Son Steel Rolling Mill No. 2 project
– Commodity: material and equipment
– Volume: 6,562 CBM / 220 packages
– Vantage’s scope: loading on board and sea transportation by Break Bulk from Shanghai port to Nghi Son port
– Shipment time: 12 – 19 Feb 2022

Vantage Successfully Transported Shipment For Nghi Son Steel Rolling Mill No. 2 Project By Break Bulk

Vantage has just transported safely a shipment of 220 bales for Nghi Son Steel Rolling Mill No. 2 project in Thanh Hoa.

Although the customer’s schedule is quite urgent, and the Shanghai port is also in a serious situation of port congestion, Vantage still finds the bulk ship that suits the customer’s requirements in a short time and cooperates with the agent in Shanghai to work closely with the port so that the ship can dock and load goods smoothly according to the scheduled timeline.